New Connector Field Installations Improve System Reliability
High Frequency Electronics, Times Microwave Systems
Across the country, CDMA, TDMA and GSM wireless communication sites are being upgraded to meet the requirements of the FCC’s Enhanced 911, or E911, mandate. Phase II of this ruling requires that network-based wireless location systems locate a wireless phone user to with-in 100 meters 67 percent of the time, and to within 300 meters 95 percent of the time. The quality and reliability of these systems is paramount; people’s lives may depend on it. Applications for this system are personal security, medical alerts, child tracking and accident response.
Please note:
By downloading a white paper, the details of your profile might be shared with the creator of the content and you may be contacted by them directly.